Effect of AC Mitigation on Potential Survey Forum

On Thursday, April 22, Sasan Hosein of Pond & Company will present a forum from 8 to 10 a.m. on alternating current (AC) mitigation as it affects potential surveys.

Hosein will discuss how cathodic protection (CP) and external coating have been recognized as perhaps the most reliable and cost-effective means of controlling corrosion for pipelines. Each structure or piping system that is provided CP must be tested periodically to determine the effectiveness of the CP system. Pipe-to-soil (P/S) potential measurements are recorded to determine the potential of a pipeline with respect to a reference electrode. Additionally, potential measurements are recorded in corrosion evaluations as a qualitative method to identify corrosion activity.

Hosein will explain that when properly interpreted and correlated with other measurements, P/S potentials can indicate the severity of both galvanic and electrolytic corrosion cells, as well as the level of CP in accordance with industry standard criteria. Finally, he will discuss the various challenges associated with pipeline potential readings with AC mitigation collocated with an AC corridor, and that these challenges require alternative potential evaluation approaches for pipeline integrity evaluation.

More Daily News

Thermal and Cold Spray Coatings for Corrosion Mitigation

Cold spray entails powder particles being acerated to very high velocities by a supersonic gas jet.

Read more
EAPA Forum on Intelligent Corrosion Control

On Tuesday, April 20, the East Asia & Pacific Area (EAPA) held a forum on intelligent corrosion control.

Read more
Symposium on Corrosion Management

A two-day symposium hosted by NACE STG 08 will detail novel approaches to corrosion management and the application of different corrosion management philosophies.

Read more